Every RFQ compares price and lead time. That’s where most supplier conversations start, and too often where they stop.
The costly part of sourcing rarely shows up on the quote. It shows up later: a lot that fails incoming inspection, a build date that slips, a program cancelled with stock still on the shelf, a reorder for a part that’s no longer made.
These five questions bring that later part forward. Ask them before the PO and you’ll learn more about a supplier than the quote can tell you.
1. Who inspects the parts before they ship, and against what?
“Inspected” can mean a glance at a label, or a set of tests matched to your part and your risk. Ask what gets checked, by whom, and whether it happens before the parts leave the supplier.
A good answer is specific: what they test, where, and what comes with the shipment. If the answer stays vague, assume the inspection happens on your dock. We wrote more about what “tested” should actually mean.
2. If our build date moves, what happens to the stock we committed to?
Schedules move. A customer pushes out, a design changes, a line goes down. The question is whether your stock moves with you or lands on your balance sheet early.
A good answer gives you options, like holding the stock and releasing it on your new dates. “Your PO, your problem” is also an answer. Better to hear it now.
3. If the program gets cancelled, what can you do with what’s left?
Most buyers ask this after the fact, when the parts are already sitting in a warehouse. Ask it up front.
A good answer covers more than one route: buying the lot outright, or selling it on consignment and sharing the revenue. Each trades speed against recovery, and the right choice depends on your stock.
4. Will you warn us before a part goes end-of-life, or will we find out on the reorder?
Discontinuance notices reach whoever is watching. If no one on your side is, the first sign is a reorder that comes back with a lead time you can’t plan around, or no stock at all.
A good answer names what they watch and how they’ll tell you: stretching lead times, manufacturer notices, last-time-buy dates. Then what they’d suggest, whether that’s an alternate part or a last-time buy sized to your build.
5. When something goes wrong mid-build, who picks up the phone?
Not the general inbox. A name.
Parts arrive short, a reel is mislabeled, your customer pulls the date in by three weeks. How fast it gets fixed depends on whether you have one person who knows your account, or a queue.
A good answer is a person and a direct line, plus who covers when that person is out.
How we answer them
Price and lead time get compared on every RFQ. These five rarely do, and they’re usually where the real cost shows up.
Here’s where we stand. Our lab checks parts before they ship. We can hold stock and release it around your build. NexCess turns stock you no longer need back into value. Our market read helps you see lead time and end-of-life changes coming. And for the fifth: one team behind your build.